SE Maxau - Germany, Annual Maintenance Works
Customer:
Stora Enso (Germany)
Services:
Inspection and Maintenance Services
Completed:
Feb. 2021

Inspection and maintenance of external and internal fuel feeding system. Inspection and maintenance of boiler including pressure parts, nozzle grid, wall thickness measurements at pressure parts, installation of protection shields. Repair /replacement of parts of the sootblower steam piping, replacement of strainers on attemperator injection piping. Inspection and repairs of flue gas ducts. Works included all relevant inspections and execution of the mechanical works with 33 workers from our partner company Novmar.

+
SE Maxau - Germany, Superheater 1/3 Modernization
Customer:
Stora Enso (Germany)
Services:
Design Delivery and Installation
Completed:
Feb. 2021

Redesign and upgrade of the Superheater 1/3 including design, 3rd party approvals, fabrication, delivery and installation.

+
Palm Wörth - Germany, Annual Maintenance Works
Customer:
Palm (Germany)
Services:
Delivery and installation
Completed:
Oct. 2020

Delivery and replacement of 1868 tubes of the tubular airheater, delivery and replacement of complete Economizer 1-1gas ducts, shut-down maintenance works. Execution of the mechanical works with 18 workers from our partner company Novmar.

+
Electricity Authority of Cyprus - Vasilikos ESP Unit 1&2 Optimization
Customer:
Electricity Authority of Cyprus
Services:
Delivery and Installation
Completed:
Feb. 2021

Optimization of ESP Units 1&2 at Vasilikos Power Station. The scope includes washing of ESP internals, engineering, supply and installation of new slide gate valves, replacement of existing rotary valves with double flap valves (supply and installation) and integration to the PLC, commissioning of new systems, optimization of discharge system parameters and of rapping sequence, measurements of particulate concentrations

+
Electricity Authority of Cyprus - Vasilikos Boiler Units 1&2 ESP Casing and Flue Gas Duct Reinforcing
Customer:
Andritz AG (Austria)
Services:
Representation of Andritz Power Plant Service in Cyprus
Completed:
Feb. 2020
Representation of Andritz Power Plant Service in Cyprus for the Reinforcing of the ESP Casing and Flue Gas Ducting of Boilers 1&2 at Vasilikos Power Station. The Andritz scope of works includes the engineering, fabrication, delivery and site installation of reinforcing of the ESP and flue gas ducting in order to withstand increased pressures due to the upgrade of the Boilers 1&2. The contract has been awarded to Andritz AG in February 2020
+
Electricity Authority of Cyprus - Vasilikos Boiler Unit 3 Pressure Part Condition Assessment
Customer:
Electricity Authority of Cyprus
Services:
Inspection and Maintenance Services
Completed:
Feb. 2020
Condition Assessment of Boiler Unit3 at Vasilikos Power Station. The scope of works includes visual inspections of the pressure parts, including an extensive program of wall thickness measurement at the furnace membrane walls, replica examination and tube sample removal for laboratory investigation, remnant life calculations of boiler heating surfaces
+
Electricity Authority of Cyprus - Vasilikos Boiler Units 1&2 Superheater 2 Supporting Tubes Replacement
Customer:
Andritz AG (Austria)
Services:
Representation of Andritz Power Plant Service in Cyprus
Completed:
Jan. 2020
Representation of Andritz Power Plant Service in Cyprus for the Replacement of the Supporting Tubes for Superheater 2 of Boilers 1&2 at Vasilikos Power Station. The Andritz scope of works includes the fabrication, delivery, site installation and testing of new supporting tubes for superheater 2 on Boilers 1&2. The contract has been awarded to Andritz AG in January 2020
+
Electricity Authority of Cyprus - Delivery of Generator Air Coolers for Dhekelia Power Station
Customer:
Electricity Authority of Cyprus
Services:
Delivery of Equipment
Completed:
Oct. 2019
Delivery of 8 Generator Closed Circuit Air Coolers
+
Palm Wörth - Germany, Annual Maintenance Works
Customer:
Palm (Germany)
Services:
Delivery and Installation
Completed:
Oct. 2019
Delivery and replacement of 1584 tubes of the tubular air heater, exchange of recirculation gas nozzles to the combustion chamber. Execution of the mechanical works with 24 workers from our partner company Novmar.
+
Propower Eisenhüttenstadt - Germany, Annual Maintenance Works
Customer:
Propower GmbH (Germany)
Services:
Inspection and Maintenance Services
Completed:
Sept. 2019
Inspection and maintenance of air & flue gas system, shower cleaning system, sand & ash handling (mechanical & pneumatic), RDF system and flue gas cleaning system. Inspection and replacement of nozzle roofs in the combustion chamber. Execution of the mechanical works with 19 workers from our partner company Novmar and with local contractors.
+
HKW Glückstadt - Germany, Annual Maintenance Works
Customer:
Steinbeis Energy (Germany)
Services:
Inspection and Maintenance Services
Completed:
May 2019
Inspection and maintenance of internal boiler fuel feeding system for RDF, coal and sludge and of shower cleaning system for economizer. Inspection and maintenance of boiler ash handling and flue gas cleaning ash handling systems. Inspection and maintenance of flue gas ducting system and boiler external piping. Installation of safety roof in combustion chamber. Repair of 2 leakages at the Boiler - Bed Material Heat Exchanger (BMHE). Execution of the mechanical works with 24 workers from our partner company Novmar.
+
SE Maxau - Germany, Annual Maintenance Works
Customer:
Stora Enso (Germany)
Services:
Inspection and Maintenance Services
Completed:
Jan. 2019
Inspection and maintenance of external and internal fuel feeding system. Inspection and maintenance of ash system. Inspection and maintenance of boiler including exchange of nozzle roof in the combustion chamber. Works included all relevant inspections and execution of the mechanical works with 25 workers from our partner company Novmar.
+
Larnaca Desalination - Cyprus, Super duplex piping
Customer:
MN Larnaca Desalination Co Ltd (Cyprus)
Services:
Delivery and Installation
Completed:
Dec. 2018
Fabrication, delivery and installation of duplex and superduplex piping up to a diameter of 24".
+
Palm Wörth - Germany, Annual Maintenance Works
Customer:
Palm (Germany)
Services:
Delivery and installation
Completed:
Oct. 2018
Delivery and installation of flue gas ducts, exchange of recirculation gas nozzles to the combustion chamber. Mechanical works executed with our partner company Novmar.
+
Riikinvoima - Finland, Annual Maintenance Works September 2018
Customer:
Andritz AG (Austria)
Services:
On Site Services
Completed:
Sep. 2018
Site advisory services for annual inspections and supervision of membrane wall panel exchange for a circulating fluidised bed boiler at Riikinvoima Finland for Andritz AG.
+
Propower Eisenhüttenstadt - Germany, Annual Maintenance Works
Customer:
Propower GmbH (Germany)
Services:
Inspection and Maintenance Services
Completed:
Sept. 2018
Inspection and maintenance of air & flue gas system, shower cleaning system, sand & ash handling (mechanical & pneumatic) and flue gas cleaning system. Execution of the mechanical works with 27 workers from our partner company Novmar.
+
Electricity Authority of Cyprus - Study for the Conversion of Steam Units at Dhekelia Power Station
Customer:
Andritz AG (Austria)
Services:
Representation of Andritz Power Plant Service in Cyprus
Completed:
Aug. 2018
Representation of Andritz Power Plant Service in Cyprus for the Study for the conversion of six steam units at Dhekelia Power Station in order to burn HFO 0,23% sulphur or gasoil 0,1% Sulphur. Contract has been awarded to Andritz AG in August 2018
+
EAC - Cyprus, Dhekelia Power Station Delivery of BFOT Heaters
Customer:
Electricity Authority of Cyprus (Cyprus)
Services:
Delivery of Equipment
Completed:
Mar. 2018
Delivery of 6 Bulk Fuel Oil Tank Suction Heaters.
+
HKW Glückstadt - Germany, Annual Maintenance Works
Customer:
Steinbeis Energy (Germany)
Services:
Inspection and Maintenance Services
Completed:
June 2018
Inspection and maintenance of internal boiler fuel feeding system for RDF & sludge, shower cleaning system for economizer and flue gas ducting & bag house filter. Repair of flue gas recirculation ducts. Execution of the mechanical works with 32 workers from our partner company Novmar.
+
Riikinvoima - Finland, Maintenance Works May 2018
Customer:
Andritz AG (Austria)
Services:
On Site Services
Completed:
May 2018
Site advisory services for inspection and maintenance of circulating fluidised bed boiler at Riikinvoima Finland for Andritz AG.
+
Electricity Authority of Cyprus - Vasilikos Boiler Units 1&2 Superheater 1 Bracing Tube Replacement
Customer:
Andritz AG (Austria)
Services:
Representation of Andritz Power Plant Service in Cyprus
Completed:
Apr. 2018
Representation of Andritz Power Plant Service in Cyprus for the Remnant Life Assessment of Boilers 1&2 at Vasilikos Power Station. The Andritz scope of works includes the engineering, fabrication, delivery, site installation and testing of new bracing tubes for superheater 1 on Boilers 1&2. The contract has been awarded to Andritz AG in April 2018
+
Electricity Authority of Cyprus - Vasilikos Boiler Units 1&2 Dual Firing Conversion Works
Customer:
Andritz AG (Austria)
Services:
Representation of Andritz Power Plant Service in Cyprus
Completed:
Mar. 2018
Representation of Andritz Power Plant Service in Cyprus for the Dual Firing Conversion Works (HFO or NG) for Boilers 1&2 at Vasilikos Power Station. The Andritz scope of works include the engineering, design, fabrication, testing at works, supply and delivery to Site, erection, testing, commissioning reliability and performance testing of the plant required for the conversion of the existing boilers 1 & 2 to dual firing (heavy oil or natural gas) at Vasilikos Power Station. Contract was awarded to Andritz AG in March 2018
+
Electricity Authority of Cyprus - Vasilikos Boiler Units 1&2 Remnant Life Assessment
Customer:
Andritz AG (Austria)
Services:
Representation of Andritz Power Plant Service in Cyprus
Completed:
Mar. 2018
Representation of Andritz Power Plant Service in Cyprus for the Remnant Life Assessment of Boilers 1&2 at Vasilikos Power Station. Contract has been awarded to Andritz AG in March 2018
+
SE Maxau - Germany, Annual Maintenance Works
Customer:
Stora Enso (Germany)
Services:
Inspection and Maintenance Services
Completed:
Jan. 2018
Inspection and maintenance of external and internal fuel feeding system, exchange of the vortex finder and the nozzle grid roofs. Works included all relevant inspections and execution of the mechanical works with 6 workers from our partner company Novmar.
+
Electricity Authority of Cyprus - Vasilikos Boiler Unit 3 Reconstruction of Damaged Seawater Flue Gas Desulphurization Plant
Customer:
Andritz AG (Austria)
Services:
Representation of Andritz Air Polution Control in Cyprus
Completed:
Jan. 2018
Representation of Andritz Air Polution Control in Cyprus and Area Manager for Andritz for the Reconstruction of the Damaged Sea Water Flue Gas Desulphurization (SEFGD) Plant of Boiler 3 at Vasilikos Power Station. The Andritz scope of work includes the design, fabrication, delivery, erection and reconstruction as well as testing, commissioning and performance testing of the SWFGD Plant. Contract was awarded to Andritz AG in January 2018
+
Propower Eisenhüttenstadt - Germany, Annual Maintenance Works
Customer:
Propower GmbH (Germany)
Services:
Inspection and Maintenance Services
Completed:
Oct. 2017
Inspection and maintenance of internal fuel feeding system, air & flue gas system, shower cleaning system, sludge injection  and exchange of the vortex finder. Execution of the mechanical works with 28 workers from our partner company Novmar.
+
SE Maxau - Germany, Annual Maintenance Works
Customer:
Stora Enso (Germany)
Services:
Inspection and Maintenance Services
Completed:
July 2017
Inspection and maintenance of external and internal fuel feeding system. Works included all relevant inspections and execution of the mechanical works with 15 workers from our partner company Novmar.
+
HKW Glückstadt - Germany, Annual Maintenance Works
Customer:
Steinbeis Energy (Germany)
Services:
Inspection and Maintenance Services
Completed:
May 2017
Inspection and maintenance of internal boiler fuel feeding system for RDF and sludge and of shower cleaning system for economizer. Exchange of vortex finder. Execution of the mechanical works with 15 workers from our partner company Novmar.
+
EAC - Cyprus, Vasilikos Power Station
Customer:
Electricity Authority of Cyprus (Cyprus)
Services:
Delivery of Pressure Parts
Completed:
Aug. 2017
Delivery of 2 sets of steam airheaters for boilers 1&2
+
EAC - Cyprus, Vasilikos Boiler 3 Maintenance and Welding Works
Customer:
Electrictricity Authority of Cyprus (Cyprus)
Services:
Maintenance Services
Completed:
Feb. 2017
Various maintenance works on boiler pressure parts, replacement of superheater and drum vent valves, replacement of cold reheat line control valve, fabrication and installation of new header for clean drain vessel.
+
SE Maxau - Germany, Annual Maintenance Works
Customer:
Stora Enso (Germany)
Services:
Inspection and Maintenance Services
Completed:
Jan. 2017
Inspection and maintenance of external and internal fuel feeding system. Works included all relevant inspections and execution of the mechanical works with 19 workers from our partner company Novmar.
+
EAC - Cyprus, Dhekelia Power Station Delivery of Drum Level Gauges
Customer:
Electricity Authority of Cyprus (Cyprus)
Services:
Delivery of Equipment
Completed:
Mar. 2017
Delivery of 4 sets of drum level gauges.
+
Mondi Richards Bay - South Africa, Unit 2 Annual Maintenance Works
Customer:
Andritz AG (Austria)
Services:
Project Planning and On Site Services
Completed:
Oct. 2016
Scheduling, coordination of resources and planning of the annual shutdown activities for the maintenance of the recovery boiler 2 as well as site management of the erection contractor.
+
Kib-Tek - Cyprus, Boiler Unit 20 - ECO Repair
Customer:
Andritz AG (Austria)
Services:
On Site Services
Completed:
Aug. 2016
Site Management and supervision of erection contractor for the repair of Boiler 20 Upper ECO and supporting tube leakages.
+
Smurfit Kappa - Sweden Piteå, Evaporator Upgrade
Customer:
Novmar Sp. z.o.o. (Poland)
Services:
Project Management
Completed:
2016
Project management services for the fabrication of vapor ducts, circulation pipes and process piping and dismantling of old equipment and erection of 3 new evaporator units including pumps, tanks and associated piping.
+
SE Maxau - Germany, Annual Maintenance Works
Customer:
Stora Enso (Germany)
Services:
Inspection and Maintenance Services
Completed:
Jul. 2016
Inspection and maintenance of external and internal fuel feeding system. Works indluding all relevant inspections and execution of the mechanical maintenance works with 20 workers from our partner company Novmar. 
+
HKW Glückstadt - Germany, Annual Maintenance Works
Customer:
Steinbeis Energie (Germany)
Services:
Inspection and Maintenance Services
Completed:
Apr. 2016
Inspection and maintenance of internal boiler fuel feeding system for RDF and sludge and of shower cleaning system for economizer. Works included all relevant inspections and execution of the mechanical maintenance works with a manpower of 11 workers from our partner company Novmar.
+
Electricity Authority of Cyprus - Vasilikos Boiler Units 2&3 Pressure Part Repair Works
Customer:
Andritz AG (Austria)
Services:
On Site Services
Completed:
2016
Site Management and supervision of erection contractor for the repair of Boiler 2 superheater 1.1 bracing tube leakage and cold reheat line leakage as well as Boiler 3 Economizer repairs.
+
Electricity Authority of Cyprus - Vasilikos Boiler Units 1, Superheater 1.1 & 1.2 Modification
Customer:
Andritz AG (Austria)
Services:
Project Management and On Site Services
Completed:
2016
Modification of the bracing tubes of superheater 1.1 and superheater 1.2 of boiler unit 1 to increase flow and avoid overheating of the bracing tubes. Project management services and site management for the execution of the modifications.
+
Electricity Authority of Cyprus - Vasilikos Boiler Units 1&2 Dual Fire Conversion Works
Customer:
Andritz AG (Austria)
Services:
Project Planning
Completed:
2016
Proposal preparation for a MEUR5,2 modernization project of 2 Heavy Fuel Oil fired boiler units to enable dual firing (Heavy Fuel Oil / Natural Gas. Services included requests for quotations from sub-suppliers, coordination of engineering resources and commercial sales, total cost calculation and assembly of the complete proposal for internal approvals and submission to the final customer.
+
Mondi Frantschach - Austria, Evaporator Concentrator
Customer:
Andritz Oy (Finland)
Services:
On Site Services
Completed:
2015
Site advisory services for the mechanical, electrical and instrumentation installation of an additional HD evaporator, condensate and firing liquor vessels and pumps, HD circulation pump, and interconnecting pipework including terminations to existing plant. Duplex, stainless steel and carbon steel materials.